IO-390-D Series Engine Maintenance Manual
72-10
© 2020 Avco Corporation. All Rights Reserved
Page 126
March 2020
IO-390-D Series Engine Maintenance Manual
Engine Assembly Checklist for IO-390-D Series Engines (Cont.)
Item
Comments
Done
Complete the “Injection Nozzle Installation”
procedure in Chapter 73-10.
Install new fuel lines and complete the “Fuel Line
Installation” procedure in Chapter 73-10.
Complete the “Starter Installation” procedure in
Chapter 72-70.
Complete the “Alternator and Bracket Installation”
and “Alternator Belt Installation” procedures in
Chapter 72-70.
Install the engine in the airframe per instructions in
the
IO-390-D Series Engine Installation and
Operation Manual
and applicable Airframe
Maintenance Manual.
Complete the “Add Oil to the Engine” procedure in
Chapter 12-10.
Complete an “Operational Ground Check” per
Chapter 72-00.
Complete the field run-in, run-up, flight test, and
break-in per the “Field Run-In” and “Engine
Initiation” Chapters of the
IO-390-D Series Engine
Installation and Operation Manual.