12. Select the file to be transferred in the window Open and click on the Open button.
The file type Project Files (*.ds) can be selected.
13. Click on button Send Project in the Update Dialog dialog.
The file is now sent to the TPI-8/TPI-12. The successful transmission is indicated by the name of the project file in
the IRIS-Net Update Server dialog at the TPI-8/TPI-12.
14. Click on button Reload latest Project in the IRIS-Net Update Server dialog at the Touch Panel.
The new project is loaded.
15. Check the new project at the Touch Panel.
16. If the new project works, click on button Save c Reboot in the IRIS-Net Update Server dialog..
17. To restore the previous project file, turn off the power supply system of the Touch Panel. The old project will be
loaded when switching on the Touch Panel next time.
Updating the IRIS-Net application file
HINT: The following description refers to IRIS-Net version V2.0 or newer. The IRIS-Net version installed at the TPI
must be V1.8.0 or newer. For older version of IRIS-Net (e.g. V1.7.1) please see page 404.
The purpose of this procedure is to build a connection between a PC and a TPI-8/TPI-12 and updating the IRIS-Net
project file of the TPI-8/TPI-12. In the following it is assumed that the file to be transferred is available at the PC.
IRIS-Net
TOUCH PANELS | en 543
Bosch Security Systems B.V.
User Manual
2017.05 | 3.20 | F.01U.119.956