![Beckman Coulter UniCel DxC Synchron 600 Instructions For Use Manual Download Page 349](http://html.mh-extra.com/html/beckman-coulter/unicel-dxc-synchron-600/unicel-dxc-synchron-600_instructions-for-use-manual_2719768349.webp)
As-Needed/As-Required Maintenance
Sample and Reagent Probe Flushing
UniCel DxC Systems Instructions For Use A13914
Maintenance
October 2005
Page 10-103
10
To flush the probe assembly, follow the steps below.
Note: Run controls to make sure that the cleaning completely removed the blockage.
Step
Action
1
Press the STOP button on the instrument to stop all motors.
2
Place a small cup under the collar wash of the probe to be flushed.
3
Unscrew the upper fitting (1) above the bead assembly to disconnect the DI
water line. Do not remove the level sense bead (2) otherwise alignments
will be required.
Figure 10.73
4
Connect the Probe Cleaner Tubing Assembly to the top of the probe
assembly where the fitting for the probe tubing was removed in Step 3.
Tighten no more than finger tight.
5
Fill a 10 mL syringe with diluted cleaning solution or other recommended
wash solution. Connect the syringe to the other end of the probe cleaning
assembly.
6
Dispense all of the syringe contents through the probe into the collection
cup. Repeat until 50 mL has been dispensed. Empty the collection cup as
often as necessary.
7
Remove the cleaning assembly from the probe. Rinse the probe tubing
fitting with deionized water and dry with a cotton swab wrapped in lintless
tissue.
8
Reconnect the DI water line into the black fitting at the top of the probe.
9
Prime the sample and reagent probes by performing the automated probe
cleaning procedure listed in Weekly Maintenance,
.
A015947P.EPS
2
1