2.3.8
LOCKERS
2.3.8.1
TRAKA MODULAR LOCKERS
2.3.8.1.1
MODULAR LOCKER PREPARATION
NOTE:
Traka Modular Lockers are designed specifically to suit a customer's requirements. Therefore the
images displayed in this guide may differ to the system you are installing, however the same principles
apply.
Before attaching a Traka Locker system to the wall you will need to remove various parts in order to access the
various fixing holes. Please refer to the
NOTE:
Any plastic protective film should be removed after installation in order to protect the finishes.
Locker Preparation...
1.
Carefully unpack your Traka Locker system and ensure all the necessary parts are there using the
2.
Using the Master Keys unlock the Cam Locks on each side of the locker and lift up the hinged Access Cover to
expose the Interface boards and cables.
Beneath the cover you will see the locker PCBs connecting all of the lock cables and RFID cables (if
applicable). If you have 10 compartments in each module there will be a locker PCB fixed to the top of every
module. If you have less than 10 compartments in each module the PCBs will be positioned in the most
suitable locations for connecting the cables.
3.
To remove a module, disconnect the ribbon cable from the PCB (if applicable), and disconnect the earth cable
connecting the module to the locker frame.