Performance Verification
Publication 31470-001, Rev C, November 2, 2017
4-7
4.4.3
GPIB Port Check
The following steps confirm that the GPIB port is functional:
1.
Set the 8650B to the desired address (the default is 13; see Section 2.3.1.2 for instructions on how to set
the GPIB mode and address).
2.
Connect the GPIB controller to the GPIB Port on the rear of the 8650B.
3.
Send the command (if emulating an HP 438):
*IDN? or ?ID
(*IDN? is the IEEE 488.2 Common ID query. When addressed to talk after receiving the command, the
8650B will output a string that identifies itself as 8651B or 8652B.)
4.
Display the response on the controller.
This completes the performance verification test for the 8650B Universal Power Meters and its sensors. If the
instrument has performed as described in this chapter, it is correctly calibrated and within specifications.
Содержание 8650B Series
Страница 3: ...Series 8650B Universal Power Meters Publication 31470 001 Rev C November 2 2017 iii ...
Страница 18: ......
Страница 32: ......
Страница 78: ......
Страница 236: ......
Страница 244: ......
Страница 258: ......
Страница 263: ...Menu Structure Publication 31470 001 Rev C November 2 2017 D 3 Figure D 3 Modulation Sensor B Setup Menu Structure ...
Страница 265: ...Menu Stucture Publication 31470 001 Rev C November 2 2017 Page D 5 Figure D 4 Meter Setup Menu Structure ...
Страница 267: ...Publication 31470 001 Rev C November 2 2017 Last page of the document ...