CONTROL SYSTEM
(4)Turn the throttle stop screw
4
in
direction
c
or
d
until the specified
engine idling speed is obtained.
EXHAUST GAS CONTROL
PROCEDURES
1. Install:
Exhaust probe set
Installing steps:
(1)Remove the Apron.
(2)Remove the 8 mm bolt
1
and gasket.
(3)Install the exhaust gas probe
2
.
(4)Connect the hose
3
between the
probe and the surge tank
4
.
2. Preparation for measuring:
Engine temperature
Warming up steps:
(1)Run the engine in neutral at the
specified speed for 15 minutes
a
.
(2)With shift in position rev the engine 3
times
b
.
(3)Keep in neutral again, the specified
speed for 1 minutes
c
.
Direction
c
Engine idling speed
increases.
Direction
d
Engine idling speed
decreases.
Exhaust gas probe:
NA/90890-03161
Surge tank set:
NA/90890-03162
Engine speed:
2,000 ± 200 r/min
Engine speed during the official
test: 1,000 ± 100 r/min
3-11
Summary of Contents for F6AMH
Page 68: ...MAINTENANCE SPECIFICATIONS OUTBOARD DIMENSIONS F6AMH F6BMH F8CMH 2 15 ...
Page 72: ...MAINTENANCE SPECIFICATIONS OUTBOARD DIMENSIONS F6AMH F6MH F8CMH F8MH 2 17 ...
Page 76: ...MAINTENANCE SPECIFICATIONS OUTBOARD DIMENSIONS F8CW 2 19 ...
Page 140: ...GENERAL LUBRICATION POINTS Apply Water resistant grease NOTE Use a grease gun 3 25 ...
Page 142: ...GENERAL 3 26 ...
Page 143: ...GENERAL ALLGEMEINES GENERAL 3 26 ...
Page 502: ......
Page 503: ......