Procedure 5-36: Cleaning Soiled System Components
1. Bake: Conduct a standard high-temperature bake of the system.
2. Purge: At 24 hours, purge all gases from the system with an N
2
flow throughout, with a 50% setpoint
at all MFCs, (removing all gases aside from N
2,
100 at Torr at the reactor).
3. Removal of Toxics: Vacuum all toxic materials from the system (everything but N
2
), down to
x.e-m
.
4. Removal of Bubbler Source Lines: Remove bubbler legs (
161) and replace the bubblers
with jumpers (
Figure
5
-
161
. Bubbler Assembly Detail