K465i Operations and Maintenance
P/N 1212831 Rev C
Page 4-59
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
48. Close the pneumatic ball valve (
AV-184
) in the process pump line.
49. Close all other opened pneumatic valves (
AV-17
,
AV-18
,
AV129
and
AV-130
).
50. Set all MFCs to zero.
51. Close the N
2
gas supply valve (source isolation valve
MV-3
).
52. Verify that all toxic gas monitors have sufficient tape to provide continuous monitoring throughout the
shutdown period.
53.
Turn off the heater filament power supplies.