Safety Precautions and Hazard Management
In addition to the technician responsible for operating the system, a second site-
qualified technician must be present in the building when operating the system.
Before initiating the startup procedure make sure by checking with the system
supervisor or facility safety coordinator that all safety conditions have been met.
Verify that no safety alarms are currently occurring and that recently recorded alarms have
been properly acknowledged and addressed.
PROCEDURES IN THIS SECTION
Daily Startup and System Readiness
Startup Following a Maintenance Shutdown
Startup Following a Facilities Maintenance Shutdown or Emergency Electrical Stop
REFERENCE DRAWINGS
The following drawings are provided to assist in the performance of the procedures
contained in this section:
ASSOCIATED PROCEDURES IN THIS SECTION
K465i GaN System Shutdown
Palladium Cell Operation
Vacuum Pump Operation
Robot Setup and Adjustment