K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-40
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
8. Remove the liner for the heater assembly.
Figure 5-36. Liner for Heater Assembly (After Removal from Reactor)
9. Vacuum the bottom of the chamber paying special attention to the groove in which the liner for the
heater assembly rests to ensure there is no debris left in the groove.
10.Vacuum out the square exhaust ports using a smaller vacuum line which allows access to this smaller
area.
11.Use DRY cleanroom wipes to slowly wipe the walls of the chamber (
no IPA is to be used
).