K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-69
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Figure 5-67. Forklift Preparation
16. Insert retaining pins into the holes on block, making sure that the pins are fully inserted before lifting
the FF.
Figure 5-68. Retaining Rings and Forklift
17.
Lift FF to approximately 3’ from the floor and install leak check fitting on the VCR gland as shown
below on the Viewport Adapter.