K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-144
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Figure 5-141. O-ring and Second Stage
51. Install the third stage housing body on top of the second stage outer housing body.
52. Ensure that there is a good fit and that both surfaces touch the o-ring.
53. Place the belly band around the o-
ring and over the two protruding flanges, and tighten with a 7/16”
nut driver.
54. Install the new third stage filter assembly (insert and large particle filter) as shown below. Verify the
new filter assembly sits flush with the outer housing.