K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-45
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
24. Vacuum and then slowly wipe the exhaust ring using dry Cleanroom wipes (No IPA).
Figure 5-41. Vacuuming of the Exhaust Ring
25. Reinstall the exhaust ring.
26. Vacuum the entire reactor chamber again.
27. Ensure that no tools and wipes have been left in or around the chamber.
28. If scheduled, proceed with flow flange disassembly and maintenance as described in K465i GaN Flow
29. If scheduled, proceed with heater maintenance as described in the K465i GaN Heater Maintenance.
30. Vacuum out the entire reactor chamber again (after heater reassembly if performing heater
maintenance), using clean room wipes (wrapped around and overlapped finger-sized plastic objects),
to free particles.
Note:
When re-installing a heater assembly that was removed for maintenance or
replacement, follow the procedure given for Heater Reinstallation.
HEATER REINSTALLATION