K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-84
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Note:
Keep the gasket level as it is lowered onto the cold plate.
Support the areas near the shutter cutouts to prevent bending as shown below.
Figure 5-85. Leveling and Support of Gasket During Lowering
Note:
The gasket will NOT sit flat when it is installed on the cold plate.
20. With completion of the screen and gasket installation, flip the CP upside down.
21. Install a ¼-20 lifting loop on each side of the CP as shown.