K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-83
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Figure 5-84. Gasket Crease
18. The flow flange has a pin with a corresponding slot on the cold plate. Install the two small thru holes
(pictured above) near the pin. The pin will go thru one of these two holes.
19. Using two people, lift the gasket above cold plate, align the shutter cutouts on the gasket and cold
plate, check that the cold plate’s water tubes are aligned with the gasket’s holes, and lower the gasket
onto the cold plate.