K465i Operations and Maintenance
P/N 1212831 Rev C
Page 6-3
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Lid Closed
Green indicates the Cassette lid is closed. Red it is open.
Door Closed
Green the Cassette door is closed. Red it is open.
Door Locked
Green indicates the Cassette door is locked. Red indicated it is
unlocked.
Procedure
6-
1: Extend the Glove Box
To extend the Glove Box window to display the Cassette Chamber and other
features, click on the Plus (+) button on the upper right side of the window
(
X
Figure 1
X
).
PUMP DOWN
Check that the pressure is above atmosphere. Start and do the steps given below to achieve
pump-down status.
Procedure 6-2: Pump Down Pressure
1.
Carrier Chamber
a)
If pressure is low, chamber is in vacuum(what is low? config item), goto
complete
b)
If the cassette pump down/ pump purge is going on, wait until they complete
for max 20 mins. If after 20 mins they are not complete, generate error and
complete sequence
c)
Check Vent Valve(5) is closed
d)
Checks that the lift is down (not present in cassette chamber)
e)
Generate an error if lid is not closed/ carrier lid is not down/ carrier is not on
pedestal
f)
Show all Di (status) in panel
g)
Proceed to open Vacuum Valve(6)
h)
Pressure goes down top vacuum(configuration for carrier)
i)
Pump Purge (config settings for High, low Pressures and number of cycles
specific to carrier chamber)
j)
For carrier when this is done it is the Ready state for loading the wafer into
the carrier chamber.