K465i Operations and Maintenance
Doc 1100481 Rev C
Page 5-1
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
CHAPTER 5.
MAINTENANCE AND REPAIR
In periodic or scheduled Reactor Chamber maintenance/cleaning it is common practice to
remove the Flow Flange and Heater assemblies without disassembling them. This document
first offers procedures for Reactor Chamber maintenance and cleaning, followed by detailed
procedures for FlowFlange and Heater maintenance. Reactor Chamber restoration/system
restoration procedures appear following the sections on FlowFlange and Heater
maintenance.
The
Maintenance
sections of this document include:
Routine Maintenance and Basic Steps
Reactor Chamber Maintenance
Flow Flange Maintenance
Heater Maintenance
System Restoration
Transfer Hub Chamber Maintenance
Particle Filter Maintenance
Bubbler and Bath Maintenance
Leak Checking
Gas Monitoring
Decommissioning Instructions
This chapter employs linked reference documents, such as the
To access these references, click on the linked (highlighted or blue) text.
Maintenance Schedule Information
Note:
Follow the
recommended
Routine Maintenance Schedule for each major system
component (including Chamber, Flow Flange, Exhaust Lines, Particle Filter and
Loadlock/Hub).