K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-68
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Figure 5-65. Flow Flange Positioning and Glands
14. Secure the Viewport Adapter using 16 Silver plated SHCS, #10-
32 x 1.5” onto the FF using a torque
wrench set at 90 in-lbs, at the sequence shown below.
Figure 5-66. Viewport Securing
15. Prepare the FF forklift by ensuring that the retaining pins are in the outside position and align the
retaining pins on the fork arms with the retaining holes on the FF lifting brackets.