K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-52
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Section 5.4.
K465i GaN Flow Flange Maintenance
This section covers maintenance to the K465i GaN flow flange. It includes disassembly,
cleaning and reassembly procedures. It assumes that the flow flange has been removed
following the steps outlined in the previous section, Reactor Chamber Maintenance.
Safety Precautions and Hazard Management
In addition to the technician responsible for performing the maintenance, a second
site-qualified technician must be present in the FAB during the maintenance
procedure.
Whenever maintenance or other system related functions are performed on Veeco
TurboDisc systems, safety procedures must be followed, including the wearing of all
required personnel protection equipment.
Safety glasses are to be worn when using methanol.
Cleanroom compatible gloves should be worn when performing this maintenance.
The flow flange assembly is extremely heavy. Use a forklift to remove the assembly
from the reactor and to support it during maintenance.
PROCEDURES IN THIS SECTION
Recommended Tools and Materials
Disassembly Guide
Flow Flange Cleaning
Reassembly Guide
REFERENCE DRAWINGS
The following drawings are provided to assist in the performance of the procedures
contained in this section:
ASSOCIATED PROCEDURES
K465i GaN Reactor Chamber Maintenance
ASSOCIATED DOCUMENTS