K465i Operations and Maintenance
P/N 1212831 Rev C
Page 5-61
Copyright
©
2012
Veeco Instruments, Inc. Confidential
All Rights Reserved
Figure 5-55. Chamber Ready for Leak Checking
8.
Close
each manual valve (
MV53 and MV54
)above the Ebara pumps (see Figure 5-56). The system is
ready to be leak checked. Follow sections 5-74 and 5-109 in the K465i GaN Operations and
Maintenance CD for leak checking procedures.
Figure 5-56. Closing of Manual Valves MV53 and MV54.