199
Learning Advanced Features
Group Code Name
LCD Display
Parameter Setting
Setting Range
Unit
conversion Factor
95
Reduced CO2 (Ton) Saved CO2 - 1 0
-9999–9999
Ton
96
Reduced CO2
(1000 Ton)
Saved CO2 - 2 0
-160–160
Ton
97
Reset Energy
payback parameter
Reset Energy
0
0 No
-
1 Yes
Energy Payback Value Function Setting Details
Note
Note that the actual saved energy may differ from the displayed values, since the resulting values are
affected by user-defined codes such as AP2-87 and AP2-88.
Code
Description
AP2-87 M1 AVG PWR
Sets the average power value of the #1 motor and calculates the energy
savings based on the set value.
AP2-88 M2 AVG PWR
Sets the average power of the #2 motor and calculates energy savings
based on the set value.
AP2-89 Cost per kWh
Sets the cost per 1 kWh. Multiply the energy payback counter value with
the value set at AP2-89 to calculate the total saved cost. This value is
displayed in AP2-92–93.
AP2-90 Saved kWh
AP2-91 Saved MWh
Displays the saved energy in kWh (AP2-90) and MWh (AP2-91).
When the value reaches 999.9 (kWh) and continues to increase, AP2-91
becomes 1 (MWH), AP2-90 resets to 0.0, and it continues to increase.
AP2-92 Saved Cost1
AP2-93 Saved Cost2
Displays the saved cost to the one-tenth place at AP2-92. When the value
reaches 999.9 and continues to increase, AP2-93 becomes 1, AP2-92
resets to 0.0, and it continues to increase.
AP2-94 CO2 Factor
Sets the CO2 reduction rate per 1 MW (default value=0.5). The value is
multiplied with AP2-90 and AP2-91, and the resulting values are
displayed at AP2-95 and AP2-96.
AP2-95 Saved CO2-1
AP2-96 Saved CO2-2
Displays the CO2 reduction rate in tons (AP2-95) and kilo-tons (AP2-96).
AP2-97 Reset Energy
Resets all the saved energy parameters.
Summary of Contents for 6731001500
Page 1: ......
Page 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500kW 3 Phase ...
Page 34: ...21 Installing the Inverter 400 V 220 500kW ...
Page 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Page 66: ...Perform BasicOperations 53 ...
Page 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Page 107: ...94 Learning BasicFeatures ...
Page 187: ...174 Learning Advanced Features PIDCommandBlock ...
Page 188: ...175 Learning Advanced Features ...
Page 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Page 190: ...177 Learning Advanced Features PIDOutputBlock ...
Page 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Page 205: ...192 Learning Advanced Features EPID1Controlblock ...
Page 206: ...193 Learning Advanced Features EPID2Controlblock ...
Page 228: ...215 Learning Advanced Features ...
Page 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Page 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Page 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Page 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Page 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Page 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Page 588: ...575 Troubleshooting ...
Page 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Page 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Page 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Page 643: ...630 ...
Page 644: ...631 ...
Page 645: ...632 ...