211
Learning Advanced Features
Code
Description
PRT-72 LDT
Source
Selects a source for level detection.
Setting
Function
0
Output Current
Sets the output current as the source.
1
DC Link Voltage
Sets the DC link voltage as the source.
2
Output Voltage
Sets the output voltage as the source.
3
kW
Sets the output power as the source.
4
hp
Sets the output power as the source.
5
V1
Sets the V1 terminal input as the source.
6
V2
Sets the V2 terminal input as the source.
7
I2
Sets the I2 terminal input as the source.
8
PID Ref Value
Sets the PID reference as the source.
9
PID Fdb Val
Sets the PID feedback as the source.
10
PID Output
Sets the PID output as the source.
11
EPID1 Fdb Val
Sets the external PID feedback 1 as the source.
12
EPID2 Fdb Val
Sets the external PID feedback 2 as the source.
PRT-73 LDT Dly
Time
Sets the delay time for the operation set at PRT-70.
PRT-74 LDT Level
Sets the level for the level detection.
The following are the setting ranges and default values by the source.
Source
Default Value
Setting Range
Output
Current
Rated current
0–150% of the rated current
DC Link
Voltage
350
700
0–450 V (2 Type)
0–900 V (4 Type)
Output
Voltage
230
460
0–250 (2 Type)
0–500 (4 Type)
kW
90% of the Inverter
rated power
0–150% of the Inverter rated
power
V1
9.00 V
0.00–12.00
V2
9.00
-12.00–12.00
I2
18.00
0.00–25.00
PID Ref
Value
50
PID Unit Min–PID Unit Max
PID Fdb Val
50
PID Unit Min–PID Unit Max
PID Output
50
-100.00%–100.00%
EPID1 Fdb
Val
50
EPID1 Unit Min–EPID1 Unit Max
Summary of Contents for 6731001500
Page 1: ......
Page 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500kW 3 Phase ...
Page 34: ...21 Installing the Inverter 400 V 220 500kW ...
Page 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Page 66: ...Perform BasicOperations 53 ...
Page 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Page 107: ...94 Learning BasicFeatures ...
Page 187: ...174 Learning Advanced Features PIDCommandBlock ...
Page 188: ...175 Learning Advanced Features ...
Page 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Page 190: ...177 Learning Advanced Features PIDOutputBlock ...
Page 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Page 205: ...192 Learning Advanced Features EPID1Controlblock ...
Page 206: ...193 Learning Advanced Features EPID2Controlblock ...
Page 228: ...215 Learning Advanced Features ...
Page 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Page 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Page 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Page 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Page 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Page 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Page 588: ...575 Troubleshooting ...
Page 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Page 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Page 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Page 643: ...630 ...
Page 644: ...631 ...
Page 645: ...632 ...