638
I2 voltage input ...........................................................................96
keypad .............................................................................................87
RS-485 ..............................................................................................99
TI pulse input ................................................................................97
V1 voltage input .........................................................................88
frequency setting (Pulse train) terminal... Refer to
TI
terminal
frequency setting(voltage) terminal ..........Refer to
V1
terminal
frequency upper and lower limit value
Frequency lower limit value.............................................. 133
Frequency upper limit value ............................................ 133
fuse specifications ..................................................................... 547
G
ground .................................................................................................. 27
class 3 ground ..............................................................................29
ground cable specifications .................................................14
ground fault trip ............................... Refer to
Ground Trip
Ground Trip .................................................................................... 506
H
H100 expansion common area parameter ........... 359
control area parameter (Read/Write) ........................... 368
memory control area parameter (Read/Write) ....... 371
monitor area parameter (read only) ............................. 359
half duplex system ................................................................... 335
I
I/O point map.............................................................................. 385
I2 39
analog input selection switch (SW4) ...............................39
frequency setting(current/voltage) terminal .............39
I2 Terminal ......................................................................................... 94
IA (illegal data address) ........................................................ 349
ID (illegal data value) ............................................................. 349
IF
(illegal
function) .................................................................................... 349
IN (Input terminal function group) .................... 60, 411
In Phase Open ............................................................................. 506
initializing accumulated electric energy count ... 250
input and output specifications ..529, 564, 565, 566
input open-phase fault trip .............. Refer to
In Phase
Open
input phase open
input open-phase protection .......................................... 314
input power frequency ......................................................... 243
input power voltage ............................................................... 243
input power voltage settings ........................................... 243
input terminal ..................................................................... 38, 138
A (NO) or B (NC) terminal configuration ..................... 138
bit setting .................................................................................... 138
CM terminal ..................................................................................38
I2 terminal ......................................................................................39
NO/NC configuration ........................................................... 138
P1–P7 terminal ............................................................................38
TI terminal ......................................................................................39
V1 terminal ....................................................................................38
VR terminal ....................................................................................38
input terminal contact
A contact ..................................................................................... 315
B contact ...................................................................................... 315
Input terminal function group ...... Refer to IN (Input
terminal function group)
inspection
annual inspection ................................................................... 521
bi-annual inspection ............................................................. 523
daily inspection ........................................................................ 520
installation .......................................................................................... 17
basic configuration diagram
...........................................18
installation flowchart ...............................................................17
location............................................................................................11
mounting the Inverter ............................................................19
side-by-side installation .........................................................12
wiring ...............................................................................................26
installation conditions ............................................................... 10
INV Over Load
Summary of Contents for 6731001500
Page 1: ......
Page 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500kW 3 Phase ...
Page 34: ...21 Installing the Inverter 400 V 220 500kW ...
Page 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Page 66: ...Perform BasicOperations 53 ...
Page 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Page 107: ...94 Learning BasicFeatures ...
Page 187: ...174 Learning Advanced Features PIDCommandBlock ...
Page 188: ...175 Learning Advanced Features ...
Page 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Page 190: ...177 Learning Advanced Features PIDOutputBlock ...
Page 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Page 205: ...192 Learning Advanced Features EPID1Controlblock ...
Page 206: ...193 Learning Advanced Features EPID2Controlblock ...
Page 228: ...215 Learning Advanced Features ...
Page 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Page 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Page 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Page 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Page 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Page 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Page 588: ...575 Troubleshooting ...
Page 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Page 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Page 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Page 643: ...630 ...
Page 644: ...631 ...
Page 645: ...632 ...