643
capacitor life estimation ...................................................... 329
fan life ............................................................................................ 331
password .................................................................. 245, 246, 372
payback counter ........................................................................ 190
peripheral devices ..................................................................... 544
phase-to-phase voltage ....................................................... 515
PID
flow control ................................................................................ 157
pressure control ....................................................................... 157
speed control ............................................................................ 157
temperature control .............................................................. 157
PID (Advanced function group) ..................................... 434
PID (PID control) group .......................................................... 60
PID control
PID openloop ............................................................................ 176
PID operation sleep
mode ................................................. 174
PID operation switching ..................................................... 176
PID reference ............................................................................. 168
PID control group ................ Refer to PID (PID control)
group)
pipe break ....................................................................................... 204
pipe break dectection control
Pipe Broken ................................................................................ 204
pipe break detection control
Pipe Broken ................................................................................ 508
Pipe Broken Warning ............................................................ 509
Pipe Broken fault trip ........... Refer to
PipeBroken Trip
PNP mode (Source).................................................................... 41
PNP/NPN mode selection switch (SW2) ................... 36
NPN mode (Sink) ........................................................................42
PNP mode (Source)...................................................................41
post-installation checklist ....................................................... 48
potentiometer ................................................................................. 38
power braking ................................................................................ 81
power consumption ................................................... 300, 301
power input terminalRefer to
R/S/T terminal
, Refer
to
R/S/T terminal
, Refer to
R/S/T terminal
power output terminal ......... Refer to
R/S/T terminal
,
Refer to
R/S/T terminal
, Refer to
R/S/T terminal
power terminal board wiring .............................................. 29
power terminals ................................................................... 32, 33
N- terminal .............................................................. 31, 32, 33, 34
P(+) terminal ......................................................................... 33, 34
P(+)/B terminal ............................................................................33
P1+ terminal .................................................................................31
P2+ terminal ......................................................................... 31, 32
P2+/B terminal ............................................................................31
P3+ terminal .................................................................................32
R/S/T terminals ..................................................... 31, 32, 33, 34
U/V/W terminal .................................................... 31, 32, 33, 34
PowerOn Resume ..................................................................... 303
PowerOn Resume by serial communication ........ 303
Power-on Run .............................................................................. 108
pre-heating .................................................................................... 206
preparing the installation .......................................................... 1
press regeneration prevention ....................................... 286
P gain/I gain ............................................................................... 287
product identification................................................................... 1
product specification details ............................................ 535
protocol
BACnet protocol ...................................................................... 373
LS INV 485 protocol ............................................................... 345
Metasys-N2 protocol............................................................. 384
PRT (protection features) group ....................................... 60
PRT (Protection function group) ................................... 472
Pulse output terminal ................. Refer to TO terminal
pump clean .................................................................................... 192
Pump clean trip ................... Refer to
Pump Clean Trip
PWM ................................................................................................... 238
frequency modulation ......................................................... 238
Q
quantizing .......................................................................................... 89
Quantizing
noise ..................................................................................................89
quick reference ................................................................................ iv
R
R/S/T terminals ........................................ 31, 32, 33, 34, 513
Summary of Contents for 6731001500
Page 1: ......
Page 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500kW 3 Phase ...
Page 34: ...21 Installing the Inverter 400 V 220 500kW ...
Page 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Page 66: ...Perform BasicOperations 53 ...
Page 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Page 107: ...94 Learning BasicFeatures ...
Page 187: ...174 Learning Advanced Features PIDCommandBlock ...
Page 188: ...175 Learning Advanced Features ...
Page 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Page 190: ...177 Learning Advanced Features PIDOutputBlock ...
Page 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Page 205: ...192 Learning Advanced Features EPID1Controlblock ...
Page 206: ...193 Learning Advanced Features EPID2Controlblock ...
Page 228: ...215 Learning Advanced Features ...
Page 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Page 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Page 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Page 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Page 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Page 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Page 588: ...575 Troubleshooting ...
Page 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Page 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Page 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Page 643: ...630 ...
Page 644: ...631 ...
Page 645: ...632 ...