235
Learning Advanced Features
The parameters in the table above shows the frequency command sources for the keypad and the
operation command sources for the Time Event.
The following is an example of an inverter operation utilizing the Time Period modules 1 and 2
with Time Events 1 and 2:
Time Period 1 is used to operate the inverter on Mondays and Tuesdays from 10AM to 8PM. Time
Period 2 is used to operate the inverter on Tuesday from 12PM to 5PM.
Time Event 1 triggers forward operations based on the frequency input on the keypad and
continues the operation for the time set at Time Period module 1. Time Event 2 operates the
inverter at Speed-L for the time set at Time Period module 2.
On Mondays, the inverter operates in the forward direction based on the frequency input on the
keypad from 10AM to 8PM (Time Event 1). On Tuesdays, it operates again in the forward direction
based on the keypad frequency input from 10AM to 12PM (Time Event 1), and then operates at
Speed-L from 12PM to 5PM (Time Event 2). When the operation assigned by Time Event 2 is
complete, the inverter resumes its Time Event 1 operation (the inverter operates based on the
keypad frequency input from 5PM to 8PM).
74
Time Event 2
connection
T-Event1Period
00000000010
000000000001–
111111111111
75
Time Event 2
functions
T-Event2Define
3: Speed-L
Refer to AP3-73
Summary of Contents for 6731001500
Page 1: ......
Page 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500kW 3 Phase ...
Page 34: ...21 Installing the Inverter 400 V 220 500kW ...
Page 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Page 66: ...Perform BasicOperations 53 ...
Page 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Page 107: ...94 Learning BasicFeatures ...
Page 187: ...174 Learning Advanced Features PIDCommandBlock ...
Page 188: ...175 Learning Advanced Features ...
Page 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Page 190: ...177 Learning Advanced Features PIDOutputBlock ...
Page 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Page 205: ...192 Learning Advanced Features EPID1Controlblock ...
Page 206: ...193 Learning Advanced Features EPID2Controlblock ...
Page 228: ...215 Learning Advanced Features ...
Page 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Page 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Page 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Page 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Page 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Page 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Page 588: ...575 Troubleshooting ...
Page 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Page 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Page 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Page 643: ...630 ...
Page 644: ...631 ...
Page 645: ...632 ...