Maintenance
584
10.3
Storage and Disposal
10.3.1
Storage
If you are not using the product for an extended period, store it in the following way:
•
Store the product in the same environmental conditions as specified for operation (Refer to
Installation Considerationson page 10).
•
When storing the product for a period longer than 3 months, store it between -10 ˚C and 30
˚C, to prevent depletion of the electrolytic capacitor.
•
Do not expose the inverter to snow, rain, fog, or dust.
•
Package the inverter in a way that prevents contact with moisture. Keep the moisture level
below 70% in the package by including a desiccant, such as silica gel.
•
Do not allow the inverter to be exposed to dusty or humid environments. If the inverter is
installed in such environments (for example, a construction site) and the inverter will be
unused for an extended period, remove the inverter and store it in a safe place.
10.3.2
Disposal
When disposing of the product, categorize it as general industrial waste. Recyclable materials are
included in the product, so recycle them whenever possible. The packing materials and all metal
parts can be recycled. Although plastic can also be recycled, it can be incinerated under controlled
conditions in some regions.
If the inverter has not been operated for a long time, capacitors lose their charging characteristics and
are depleted. To prevent depletion, turn on the product once a year and allow the device to operate for
30-60 min. Run the device under no-load conditions.
Summary of Contents for 6731001500
Page 1: ......
Page 17: ...Preparing the Installation 4 37 90kW 3 Phase ...
Page 18: ...Preparing the Installation 5 110 132kW 3 Phase ...
Page 19: ...Preparing the Installation 6 160 185kW 3 Phase ...
Page 20: ...Preparing the Installation 7 220 250kW 3 Phase ...
Page 21: ...Preparing the Installation 8 315 400kW 3 Phase ...
Page 22: ...Preparing the Installation 9 500kW 3 Phase ...
Page 34: ...21 Installing the Inverter 400 V 220 500kW ...
Page 50: ...37 Installing the Inverter Inputand OutputControlTerminalBlockWiringDiagram 5 5 90kW ...
Page 66: ...Perform BasicOperations 53 ...
Page 106: ...93 Learning BasicFeatures 0 10V InputVoltageSettingDetails V1 Quantizing ...
Page 107: ...94 Learning BasicFeatures ...
Page 187: ...174 Learning Advanced Features PIDCommandBlock ...
Page 188: ...175 Learning Advanced Features ...
Page 189: ...176 Learning Advanced Features PIDFeedbackBlock ...
Page 190: ...177 Learning Advanced Features PIDOutputBlock ...
Page 191: ...178 Learning Advanced Features PIDOutputModeBlock ...
Page 205: ...192 Learning Advanced Features EPID1Controlblock ...
Page 206: ...193 Learning Advanced Features EPID2Controlblock ...
Page 228: ...215 Learning Advanced Features ...
Page 244: ...231 Learning Advanced Features TheTime Chartfor the Exception Day ...
Page 260: ...247 Learning Advanced Features SpeedSearchOperation SettingDetails ...
Page 405: ...392 RS 485 Communication Features 7 3 9 2 Control Area Parameter Read Write ...
Page 555: ...Table ofFunctions 542 8 16 4 CoolingTower MC4 Group ...
Page 558: ...Tableof Functions 545 8 16 5 Circulation Pump MC5 Group ...
Page 562: ...Tableof Functions 549 8 16 6 Vacuum Pump MC6 Group ...
Page 588: ...575 Troubleshooting ...
Page 608: ...TechnicalSpecification 595 11 3 External Dimensions 0 75 30kW 3 phase 37 90kW 3 phase ...
Page 609: ...TechnicalSpecification 596 110 185kW 3 phase ...
Page 632: ...TechnicalSpecification 619 400 V 37 500 kW Current Derating Rate ...
Page 643: ...630 ...
Page 644: ...631 ...
Page 645: ...632 ...