2-52
Removal and Installation
January 24, 2017
Removal and installation of diesel engine
CLG835H
12. Unscrew the 4 bolts on the
heat insulation bracket, and
tilt it to the radiator direction
by an angle to avoid interfer-
ence when lifting the engine.
13. Slowly operate traveling
crane, hang lifting eye on
engine with hook on wire
rope, and tauten wire rope
without lifting engine.
Tool:
Traveling crane
Wire rope with
hooks
Figures
Contents
Tools
P18P00066
P18P00067
1. Lifting eye
2. Lifting eye
1
2
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...