4-156
Removal and Installation
January 24, 2017
Work hydraulic system
CLG835H
6. Connect the boom small
cavity hose, tighten the hose
joint to 179±8Nm\
132±5.9lbf·ft
Open-end
wrench: 41mm
7. Connect the boom big cavity
hose, tighten the hose joint
to 179±8Nm\ 132±5.9lbf·ft
Open-end
wrench: 41mm
8. Connect the bucket small
cavity hose, tighten the hose
joint to 179±8Nm\
132±5.9lbf·ft
Open-end
wrench: 44mm
Figures
Operation instruction
Tools
P18H00223
P18H00224
P18H00225
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...