5-43
January 24, 2017
System Maintenance
CLG835H
A/C system regular maintenance
8. Rotate handle of screw plug
clockwise so that pintle
punctures refrigerant con-
tainer, and then rotate screw
plug handle counterclock-
wise so that the pintle exits.
9. Loosen nut on manifold
gauge connecting refriger-
ant receiver connecting
hose, drain air in the filling
hose by using refrigerant
pressure, and tighten nut
immediately after listening
"Hissing" sound.
10. Open high pressure valve 4
so that refrigerant enters
high pressure side of air
conditioning system.
11. Observe high pressure
gauge, and close high pres-
sure valve 4 until pressures
does not rise any more.
CAUTION: At the
moment, make sure high
pressure valve has been
closed, or else subsequent
operations may cause dam-
ages to compressor.
12. Start the engine to idle state
and open the cab's door and
window. And turn on the air
conditioner to cooling mode.
Adjust to the maximum
wind.
Figures
Operation step
Tools
P18A00047
P18A00048
P18A00049
1.Low pressure gauge
2.High pressure gauge
3.Low pressure valve
(
LO
)
4.High pressure valve
(
HI
)
2
1
3
4
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...