7-36
Removal and Installation
January 24, 2017
Removal and installation of work implement system
CLG835H
2) Remove the captive bolts of
the bucket lower pin on the
left and right sides.
18# Wrench
3) Remove the bucket lower
pins on left and right sides
with sledge hammer and
pin knocking tooling.
Sledge hammer
and pin knocking
tooling
4) Lift the bucket out gently
with lifting equipment, and
put it on firm ground, and
wait for repair or replace-
ment.
CAUTION: The
personnel operating
lifting equipment shall have
relevant qualifications, and
only can operate on the
premise that equipment and
lifting sling are normal and
safety is guaranteed!
Hoisting
equipment (over
3ton)
Figures
Operation instruction
Tools
P18S00056
P18S00057
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...