4-112
Removal and Installation
January 24, 2017
Work hydraulic system
CLG835H
Installation of plunger pump
The housing of assembled plunger pump must be filled with oil before starting the complete machine to
prevent the skid shoe from damage due to dry friction after starting.
Figures
Operation instruction
Tools
1. Check the pump for dam-
age, rusting and if qualified,
hang the pump to the
mounting position and install
the stud bolt to the gearbox;
2. Install the oil suction steel
pipe to the plunger pump,
tighten the bolts with the
tightening torque 90±12Nm\
66.4±8.9lbf·ft
Open-end
wrench: 15mm;
P18H00132
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...