2-50
Removal and Installation
January 24, 2017
Removal and installation of diesel engine
CLG835H
7. Unscrew the fuel pipe joint
screw connected to the die-
sel engine fuel pump with
wrench. Remove the screw,
seal gasket and keep them
in a plastic bag. Mask the
fuel pipe joint with sealing
membrane.
Tool:
Open-end
wrench 19#
Plastic sealing
bag
Plastic sealing
membrane
8. Unscrew the intercooler pipe
fixing clamp and bracket.
Unscrew the clamps at both
ends of intercooler pipe,
unplug the pipe and seal
every port with plastic seal
membrane.
Tool:
Open-end
wrench 12#, 16#
Plastic sealing
membrane
9. Unscrew the clamp at the
connection of intake pipe
and engine, unplug the
intake pipe. Unscrew the
connecting clamp between
intake pipe and intake hose,
take off the intake pipe. Seal
every port with plastic seal-
ing membrane.
Tool:
Open-end
wrench 8#
Plastic sealing
membrane
Figures
Contents
Tools
P18P00061
P18P00062
P18P00063
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...