3-29
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of torque converter-gearbox system
17. Remove the fastening bolts
used for attaching the gear
box assembly-torque con-
verter case to the engine
housing with an blower gun
and socket.
16# socket,
pneumatic
impact wrench
18. Separate the transmission
assembly from the engine,
and secure the torque con-
verter case and core
through the bolt holes with
ropes and steel wires.
Steel wire
19. Lift up the gear box assem-
bly from the machine
through the lugs with the
hoisting device and ropes
and place it in a safe area.
Sling
(2 tons)
Reference picture
Operation step
Tools required
(Remarks)
P18T00045
P18T00046
P18T00047
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...