3-45
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of front axle assembly
Installation of front axle assembly
Reference picture
Operation step
Tools required
(Remarks)
1. Take the front axle assembly
out of placed area with a
handling device, and posi-
tion it under its mounting
point.
2. Lift up the front axle assem-
bly with a hoist, and install it
on the frame.
3. Install the tightening bolts
and nuts and tighten them
with torque of 2035±170Nm\
1500.8±125.38 lbf•ft.
Sling(2 tons) 46#
socket,
pneumatic
impact wrench,
open-end 46#
fixed torque
spanner
4. Install the front axle brake
pipe and service brake
hose. Tightening torque:
37±2Nm\ 27.29±1.48 lbf•ft.
Open-fixed 24#
fixed torque
spanner
5. Lift up the tire with a hoist
and install it onto the axle,
and then install the rim nut
and tighten it to 600±60Nm\
442.5±44.25 lbf•ft.
Sling
(2 tons)30#
socket,
pneumatic
impact wrench,
open-end 30#
fixed torque
spanner
6. Lift the machine with a hoist,
remove the support device,
and put the machine onto
the ground.
Sling
(12 tons)
P18T00083
P18T00084
P18T00085
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...