2-91
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of radiator
7. Unscrew the water pipe
clamp and pull out the water
pipe from the radiator. Seal
every port with plastic seal-
ing membrane.
Tool:
Open-end
wrench 8#
Plastic sealing
membrane
8. Remove the oil inlet/return
pipes of the torque converter
oil radiator & drain pipe joint,
unplug the temperature sen-
sor connector and seal each
port with plastic seal mem-
brane.
Tool:
Outer hexagon
wrench 8#
Plastic sealing
membrane
Graph
Contents
Tools
P18P00154
P18P00155
P18P00156
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...