7-25
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of work implement system
Removal and installation of bucket lever
Removal of rocker arm
4) Install captive bolt
18# Wrench
2. Install linkage front pin
By referring to the steps for
installing linkage front pin in
installation of bucket, install
linkage front pin.
Figures
Operation instruction
Tools
P18S00039
Figures
Operation instruction
Tools
1. Remove the linkage
By referring to the steps for
removing the linkage in removal
and installation of linkage,
remove the linkage.
2. Remove bucket tilting
cylinder
By referring to the steps for
removing bucket tilting cylinder
in hydraulic system, remove the
bucket tilting cylinder from the
machine
3. Remove the middle pin of
rocker arm
1) Remove middle pin captive
bolt of rocker arm
18# Wrench
P18S00040
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...