2-75
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of DEF pump
Installation
Figures
Contents
Tools
1. Put the DEF tank into the
bracket, get the strap
through the tank body and
tighten the strap bolt.
Tool:
Open-end
wrench 10#
2. Put the DEF tank into install-
ing position from the coun-
terweight bottom and tighten
the 4 captive bolts
Tool:
3. Insert the quick joint of urea
pipe to the joint of urea tank.
It is not in place until a
sound is heard. The two
joints is different in specifica-
tion, and can not be inserted
if inversely connected.
Tool:
P18P00117
P18P00116
P18P00120
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...