7-30
Removal and Installation
January 24, 2017
Removal and installation of work implement system
CLG835H
3) Knock out boom pins on right
and left sides with pin knock-
ing tooling and sledge ham-
mer.
Pin knocking
tooling and
sledge hammer
4) Lift out the boom with lifting
equipment gently and place it
on firm ground.
CAUTION: The personnel
operating lifting
equipment shall have relevant
qualifications, and only can
operate on the premise that
equipment and lifting sling are
normal and safety is
guaranteed!
Hoisting equip-
ment (over
3ton)
Figures
Operation instruction
Tools
P18S00047
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...