3-51
January 24, 2017
Removal and Installation
CLG835H
Removal and installation of rear axle assembly
3. Apply thread lock sealant to
thread portions of bolts,
screw them into support
thread holes by 2-3 threads
by hand, and tighten them
with an air gun. Tightening
torque: 305±25Nm\
22494±18.44 lbf•ft.
24# socket,
pneumatic
impact wrench,
open-end 24#
fixed torque
spanner
4. Horizontally place rear
swing frame with the thread
hole end upward, and install
the bush into rear swing
support rack.
5. Turn over swing frame by
180°, install seal ring and
knock it to the end with
nylon hammer.
Nylon hammer
6. Turn over swing frame group
by 180°, evenly apply
molybdenum disulfide
lithium base grease to
bushing cone, and install
rear swing frame group into
spindle with lifting device.
Reference picture
Operation step
Tools required
(Remarks)
P18T00106
P18T00107
P18T00108
P18T00109
Summary of Contents for CLG835H
Page 2: ......
Page 4: ...Contents January 24 2017 CLG835H...
Page 6: ...1 2 General Information January 24 2017 CLG835H...
Page 38: ...1 34 Machine Inspection Table January 24 2017 CLG835H...
Page 156: ...3 2 Power Train System January 24 2017 CLG835H...
Page 214: ...3 2 Power Train System January 24 2017 CLG835H...
Page 272: ...3 60 Testing and adjustment January 24 2017 Power Train Test CLG835H...
Page 276: ...4 4 Hydraulic System January 24 2017 CLG835H...
Page 552: ...6 2 Driver s Cab System January 24 2017 CLG835H...
Page 608: ...7 2 Structure January 24 2017 CLG835H...
Page 662: ...8 4 Electrical System January 24 2017 CLG835H...
Page 677: ...8 19 January 24 2017 Structure Function Principle CLG835H Power System P18E00014...