Multifors 2 - Parallel Bench-top Bioreactor
Installation and Initial Operation
28 March 2018
Page
99
of
211
6.3 Mounting the Operating Panel
The operating panel is fastened with four cylindrical hexagon-
socket screws onto the mounting plate on the flanged clamps on
the equipment frame.
1 Mounting plate
2 Flanged clamp
3 Equipment frame
The mounting plate is mounted on the operating panel in the fac-
tory. The flanged clamps are mounted on the equipment frame in
the factory.
If more than one unit is to be operated using the operating panel, it
must be mounted on the master unit (Bior A + B).
In this case, a designation plate is premounted on one or two
(maximum) satellite unit(s) instead of the operating panel.
1
2
3