Multifors 2 - Parallel Bench-top Bioreactor
Installation and Initial Operation
Page
94
of
211
28 March 2018
Inappropriate installation and initial
operation
WARNING!
Risk of injury due to inappropriate installation
and initial operation!
Inappropriate installation and initial operation may
lead to severe damage to persons or loss of prop-
erty.
Therefore:
– Make sure that enough space is provided for
the installation before starting.
– Take care regarding sharp-edged components
– Keep the installation site tidy and clean! Dis-
carded components and tools may be a source
of accidents.
– Component parts must be installed profession-
ally.
– Secure component parts so that they cannot fall
off or tumble.
6.2 Location Requirements for Installation
6.2.1 General Information
The following conditions must apply for the installation of the equip-
ment:
The equipment may only be installed inside buildings.
Operating and room temperature: +5 to +40 °C
Relative humidity, non-condensing: 20 – 90%
Any other kind of set-up has to be checked/clarified with the
manufacturer and needs their written authorisation.
The supporting surface must be even and have adequate sta-
bility and carrying capacity.
The supporting surface must have an appropriate working
height (see chapter "Technical data").
There must not be any sources of electrical interference in the
environment.
Ensure appropriate illumination at the workplace.