Multifors 2 - Parallel Bench-top Bioreactor
Installation and Initial Operation
28 March 2018
Page
109
of
211
If the heating system is also working, the test is complete.
17.
Stop the bioreactor.
18.
Shut down the system.
19.
Switch off the equipment at the main switch.
20.
Shut off the supply lines.
21.
Depressurise the supply lines.