For more information about the memory
configurations supported, see “Installing
memory-modules” on page 376.
3. Optionally, you can install a second 500-watt power
supply for redundant power. With a redundant power
supply installed, you can replace a failing power
supply without turning off the server.
Additional considerations
Additionally, review the following considerations:
1. You must remove any adapter you have installed in
slot 6. You can populate slot 5 only with a half-size
adapter. Before you install the option, consider how
to maximize the performance of the adapters using
slots 1 through 5. Review the documentation that
comes with the adapters and the documentation that
comes with the server for more information.
2. You need the following items to install the Processor
Upgrade Kit.
A medium flat blade screwdriver
A medium Phillips screwdriver
The documentation that comes with the server
3. If you need to move the server to install the option,
arrange for additional help.
Caution
Use safe practices when lifting.
k
18 kg (37 lbs)
k
32 kg (70.5 lbs)
k
55 kg (121.2 lbs)
4-way Xeon upgrade installation
363
Summary of Contents for 866011U - Netfinity 5500 - 8660
Page 2: ......
Page 8: ...vi Netfinity Server HMM...
Page 214: ...1 Hard disk drive 2 Drive tray handle open position 206 Netfinity Server HMM...
Page 244: ...Screws 236 Netfinity Server HMM...
Page 247: ...Netfinity 5500 Type 8660 239...
Page 314: ...306 Netfinity Server HMM...
Page 324: ...316 Netfinity Server HMM...
Page 325: ...Related service information 317...
Page 326: ...318 Netfinity Server HMM...
Page 327: ...Related service information 319...
Page 340: ...332 Netfinity Server HMM...
Page 341: ...Related service information 333...
Page 346: ...338 Netfinity Server HMM...
Page 402: ...IBM Part Number 00N5902 Printed in U S A S1 L 98 3...