6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 827 -
LGP1EXOT
]. If the signal is to be issued from the logic programmed by the user
instead of the logic shown in Figure 4.9-26, connect the “operate completed” signal
generated in the user-programmed logic to connection point#2 “User configurable
condition”. That is, set the scheme switch [
TPOS01-LGP1EXOT
] to
PLC
and use
“TPOS01IN_TMP_38”.
††
Note: To identify the input and output signals of the other TPOS logics, see Table
4.9-16 for PLC#2, Table 4.9-17 for PLC#3 and Table 4.9-20 for the outputs.
Output signal to BO
The TPOS01 function, in Figure 4.9-41, can issue a signal “Operate P2-control” at output point
“TPOS01_P2EX_BO”, when the TPOS01 function determines that the “PLC-P2-Control” signal
is true.
(ix)
Receiving “operate command P3-control” using the PLC function
Figure 4.9-42 outlines the reception of the operate command P3-control by the PLC function.
Signal generation by
the PLC function
P2 control by the PLC function
Do nothing
Operation
decision
Success
Failed
Operate logic
P1 control from the remote-end
P2 control from the remote-end
P3 control from the remote end
P1 control from the local-end
P3 control from the local-end
P2 control from the local-end
P1 control by the PLC function
Wait for a command
P2 control by the PLC function
P3 control by the PLC function
Select logics
Signal output
P3 control from the remote end
P1 control from the local-end
P1 control from the remote-end
P2 control from the remote-end
P2 control from the local-end
P3 control from the local-end
P1 control by the PLC function
P3 control by the PLC function
Wait for a next command
Figure 4.9-42 Outline of operate command ‘P3-control’
Input signal required to connect
Figure 4.9-43 depicts the operate logic when an “Operate command P3 (PLC-P3-Control)”
signal is generated by the PLC function. There are two input points for reception of this
command signal, like the signal “Operate command P1 (PLC-P1-Control)”. That is, if an
interlock check is required, apply the signal at connection point (PLC#3:i.e.,
DEV01_P3_INTERLOCK). If, on the other hand, an interlock check is not required, apply the
signal at connection point (PLC#4:i.e., DEV01_P3_COMMAND). We shall assume the PLC#3
and PLC#4 as PLC#1 and PLC#2 in Table 4.9-4. Note that the user should set
PLC
for scheme
Содержание GR 200 Series
Страница 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Страница 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Страница 1369: ...6F2S1915 0 46 GRZ200 Soft 031 032 1348 Unit mm Panel cut out for 1 2 case size Figure 2 2 3 Panel cutout figure 1 2 size case ...
Страница 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Страница 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Страница 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Страница 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Страница 1520: ...6F2S1915 0 46 GRZ200 Soft 031 032 1499 Appendix 9 Matrix between VCT terminals and relay applications ...
Страница 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Страница 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Страница 1563: ......