6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 648 -
‡Note: The measurements in the DPOS and the DPSY functions are grouped into four
intervals in each respective device. Measurement is possible by sensing the device
events. The measured intervals are accumulated; they are grouped into four
intervals (OT1–OT4), which the user can monitor from the IED screen. Figure
4.4-2 and Figure 4.4-3 exemplify the four intervals upon occurrence of On
(Closing)-control event and Off (Open)-control event, provided that the DPOS
function operates.
Issuing Off control
OT1
OT2
Sensing
intermediate state
Device status for “Off”
On
Intermediate
Off
Figure 4.4-2 Two intervals (OT1 and OT2) for Off-control event
Issuing On control
OT3
OT4
Device status for “On”
Off
Intermediate
On
Sensing
intermediate state
Figure 4.4-3 Two intervals (OT3 and OT4) for On-control event
Tips: If the user wishes to implement the OPTIM function quickly, go to section 4.4.4,
which discusses how to map signal-points for the IEC 61850 communication.
─────────────────────────────────────────────────────────────────
Note:
The implementation of particular features is dependent upon the selection of
hardware and the configuration of functions. Several IED models do not support certain
features. To determine whether a particular feature has been implemented within an IED,
identify the IED ordering number; and check the order number for the “G&T position” whilst
referring to the comparison table below. For more information, see
Appendix: Ordering
.
Table 4.4-1 Comparative table in respective ordering numbers
Sec.
Feature
Ordering No. at “G&T”
31
32
–
Main features
NA
✓
✓
: Applicable NA: Not applicable
Содержание GR 200 Series
Страница 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Страница 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Страница 1369: ...6F2S1915 0 46 GRZ200 Soft 031 032 1348 Unit mm Panel cut out for 1 2 case size Figure 2 2 3 Panel cutout figure 1 2 size case ...
Страница 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Страница 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Страница 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Страница 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Страница 1520: ...6F2S1915 0 46 GRZ200 Soft 031 032 1499 Appendix 9 Matrix between VCT terminals and relay applications ...
Страница 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Страница 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Страница 1563: ......