6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 1163 -
conformance-statement (MICS). The MICS provides the user with information for
the LNs provided within the IED; the PICS provides the user with information to
enable the IED to communicate with both SAS and other devices. See
Appendix:IEC61850 MICS, PICS, PIXIT and TICS. It explains how the user can
obtain this information.
When TCP/IP operates, the IEDs can communicate with SAS computer, operator
workstation (OWS), engineering workstation (EWS), remote monitoring system, SNTP server.
In the SAS, the communication is served with the method of data transfer:
Report method of sending event messages like measurement, status, alarm and so on
GOOSE (Generic Object Oriented Substation Event) method of communication
between IEDs like interlock
Control method like controlling the circuit breaker (CB), the disconnector (DS), the
selector device (43), the transformer tap (TAP) and so on
Содержание GR 200 Series
Страница 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Страница 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Страница 1369: ...6F2S1915 0 46 GRZ200 Soft 031 032 1348 Unit mm Panel cut out for 1 2 case size Figure 2 2 3 Panel cutout figure 1 2 size case ...
Страница 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Страница 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Страница 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Страница 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Страница 1520: ...6F2S1915 0 46 GRZ200 Soft 031 032 1499 Appendix 9 Matrix between VCT terminals and relay applications ...
Страница 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Страница 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Страница 1563: ......