6F2S1915 (0.46)
GRZ200 (Soft 031 & 032)
- 749 -
††
Note: To identify the input and output signals of the other DPOS logics, see Table
4.8-15 for PLC#2, Table 4.8-16 for PLC#3, Table 4.8-18 and Table 4.8-20 for output
signals.
‡‡
Note: The “Operate failed” signal is issued when the state-change is not detected until
after reaching the time set by the [
DPOS01-RST
].
(v)
Receiving “Operate command On” using the PLC function
Figure 4.8-27 outlines the reception of the operate command ‘On’ with the PLC function.
Wait for a command
Operate command Off from the local-end
Operate command Off from the remote-end
Operate command Off by the PLC
Wait for a next command
Select stage
Select command Off from the remote-end
Select command On from the remote-end
Select command Off from the local-end
Select command On from the local-end
Select command On by the PLC function
Select command Off by the PLC function
Operate command On from the remote-end
Operate command On from the local-end
Signal generation by the
PLC function
Operate command On by the PLC
Do nothing
Operate
decision
Success
Failed
Operate logic
Signal output
Figure 4.8-27 Outline of Operate command ‘On’
Input signal from the PLC function
Figure 4.8-28 describes the operate logic when an “Operate command On (PLC-On-control)”
signal is generated by the PLC function. There are two input points for reception of the signal
“Operate command On (PLC-On-control)”: the former connection point (PLC#3) is used for the
reception of the operate-command when the interlock check is required, the later connection
point (PLC#4) is used for the reception of the operate-command when the interlock check is
not required. That is, for the DPOS01 function when the “Operate command On (PLC-On-
Control)” signal generated in the user-programmed logic and when the interlock check is
required in the operate logic, user should apply the signal at connection point (PLC#3: i.e.
DEV01_CL_INTERLOCK). Alternatively, if the interlock check is not required, apply the
signal at connection point (PLC#4: i.e. DEV01_CL_COMMAND). The PLC#3 and PLC#4 are
denoted as PLC#1 and PLC#2 in Table 4.8-2. Note that the user should set
PLC
for scheme
switch [
DPOS01-LGCTRCON
].
Output signal to BO
The DPOS01 function, in Figure 4.8-28, can issue an “Operate” signal at output point
“DPOS01_OEX_BO”, when the DPOS01 function determines that the signal “PLC-On-Control”
Содержание GR 200 Series
Страница 1047: ...6F2S1915 0 46 GRZ200 Soft 031 032 1026 Figure 8 3 4 Screen shot from GR TIEMS ...
Страница 1354: ...6F2S1915 0 46 GRZ200 Soft 031 032 1333 Appendix 1 Signal list for common function ...
Страница 1369: ...6F2S1915 0 46 GRZ200 Soft 031 032 1348 Unit mm Panel cut out for 1 2 case size Figure 2 2 3 Panel cutout figure 1 2 size case ...
Страница 1410: ...6F2S1915 0 46 GRZ200 Soft 031 032 1389 This page is intentionally blank ...
Страница 1480: ...6F2S1915 0 46 GRZ200 Soft 031 032 1459 Appendix 6 Ordering ...
Страница 1497: ...6F2S1915 0 46 GRZ200 Soft 031 032 1476 Appendix 7 Technical data ...
Страница 1518: ...6F2S1915 0 46 GRZ200 Soft 031 032 1497 Appendix 8 Manufacture setting ...
Страница 1520: ...6F2S1915 0 46 GRZ200 Soft 031 032 1499 Appendix 9 Matrix between VCT terminals and relay applications ...
Страница 1523: ...6F2S1915 0 46 GRZ200 Soft 031 032 1502 Appendix 10 CT requirement ...
Страница 1531: ...6F2S1915 0 46 GRZ200 Soft 031 032 1510 Appendix 12 Engineering exercise ...
Страница 1563: ......