GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
Chapter 8 Replacement Procedures
8-93
8-6-1-4
AC Distribution Box Installation Procedure
1) Insert the AC Distribution Box through the rear of the machine and then push it into its original
position.
2) Fasten the AC Distribution Box using the two screws located in the lower bracket of the AC
Distribution Box.
3) Tighten the screw that connects the Ground cable to the AC Distribution Box.
4) Plug in all the internal cables to the AC Distribution Box, including the voltage setting plugs at
Jumper1 and Jumper2.
5) Install the rear, left and right covers, as described in
8-2-4-4 "Rear Cover Installation Procedure" on
page 8-7
and the
8-2-2-4 "Side Covers Installation Procedure" on page 8-4
.
Содержание Vivid 3N Pro Series
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii...
Страница 597: ......