GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
Chapter 7 Diagnostics/Troubleshooting
7-17
7-3-5
RFT Diagnostic Tests (RFT Configuration)
The RFT diagnostic tests include the tests listed below:
•
Board Test:
General RFT board test which activates the remaining tests sequentially. Each of
these tests can also be performed independently.
•
Self Test 1:
Short generic board test, generated in a local DSP.
•
Self Test 2:
High level board test, generated in a local DSP. Self Test 2 lasts six minutes.
NOTE:
Before performing the RFT test, perform the IMP and VME Bus tests, as described in
7-3-3
"Image Port (IMP) Diagnostic Tests" on page 7-13
and in
7-3-4 "VME Bus (VME) Diagnostic
Tests( RFT Configuration)" on page 7-15
. If the RFT test is performed without first performing
these tests, and errors are identified, you must perform the VME Bus test, and then the IMP
test, to ensure that the RFT board is the source of the error.
1) Access the
FE Diagnostics
dialog box, as described in
7-3-1 "Accessing the Front End Diagnostic
Options" on page 7-6
.
2) In the
FE Diagnostics
dialog box, trackball to the
RFT
tab and press
Select
,
OR
Trackball to the
RFT
button in the
Data Flow Map
and press
Select
.
The
RFT
tab is displayed, as shown below:
Figure 7-9 RFT Tab - FE Diagnostics Dialog Box
Data Flow Map
Test Description Area
Test Area
Comment Area
Tabs
Содержание Vivid 3N Pro Series
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii...
Страница 597: ......