GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
7-14
Section 7-3 - Performing Front End (FE) Diagnostics
7-3-3 Image Port (IMP) Diagnostic Tests
(cont’d)
3) In the
IMP
tab, verify that the
Comment
area indicates that the system is ready to perform the test.
4) Trackball to the
Self Test
button and press
Select
to check the performance of the IMP board. The
Self Test
LED changes color as follows:
•
Yellow:
The test is in progress.
•
Green:
The test has been completed and no problems were identified.
•
Red:
Problems were identified during the performance of the test.
5) Review the test results in the
Comment
area and proceed as follows:
•
If no problems were identified, proceed to the VME test, as described in
7-3-4 "VME Bus (VME)
Diagnostic Tests( RFT Configuration)" on page 7-15
.
•
If no problems were identified but the problem persists, contact your local GE Medical Systems
field engineer for assistance.
•
If errors were identified but the results were marginal, perform calibration, as described in
Section 6-8 "Calibration" on page 6-21
, and then repeat the IMP test.
•
If errors were identified and the results were not marginal, verify that all image port and PCI
bridge cables are connected and functioning properly, as described in
Chapter 5 -
Components
and Function (Theory)
.
If the problem persists, contact your local GE Medical Systems field
engineer for assistance.
Содержание Vivid 3N Pro Series
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii...
Страница 597: ......